三级精品自拍中文_欧美日本韩国色视频_日韩制服丝袜另类中文字幕_以及八戒理论片_亚洲综合中字无码播放_国产在线观看成人免费区_免费一级毛片激情高潮强_欧美精品午夜福利一区_久久五月天综合网_国产精选无码视频在线观看

2020 官網(wǎng)升級中!現(xiàn)在您訪問官網(wǎng)的瀏覽器設(shè)備分辨率寬度低于1280px
請使用高分辨率寬度訪問。

Consultation hotline:400-021-6779
Shanghai Suoxin reminded: take things seriously when using lightning surge generator
Release time: 2022-06-06Views: 1,011

Many people will make the same mistake in using lightning surge generator, that is, the test speed is too fast in the process of test, so today’s editor will tell you what we should pay attention to in the process of using lightning surge generator to test, so as to avoid our operational mistakes

The following points should be paid attention to in the lightning surge generator test:

1. Before the test of lightning surge generator, be sure to add connection measures according to the manufacturer’s requirements for lightning surge generator.

2. The test rate of lightning surge generator shall be once per minute, which should not be too fast, so as to provide a performance recovery process for lightning surge generator. In fact, the phenomenon of lightning strike in nature and the switching of large switches in switchyard cannot have a very high repetition rate.

3. Lightning surge generator test is generally conducted for 5 times for positive / negative polarity.

4. The test voltage of lightning surge generator should be gradually increased from low to high, so as to avoid the non-linear characteristics of volt ampere of the test object. In addition, it should be noted that the test voltage should not exceed the requirements of the product standard to avoid unnecessary damage.

 

Share to
Return to list